Our blog
Here you will find all projects, interviews and articles with cooperation partners.
Winterthur Cantonal Hospital
The conclusion of the planning and construction process for the new replacement building for Winterthur Cantonal Hospital, which lasted over ten years. A highly complex project that demanded patience and a willingness to constantly consider new solutions from everyone involved.
wvm Group
Successfully active in residential construction for over 30 years, the wvm Group has developed into Cologne’s largest owner-managed property developer. In 2017, the company, which covers the entire value chain, opened a location in Berlin and has ambitious goals here too…..
Interview with Frank Piepers
Frank Piepers, Managing Director of the wvm Group Cologne, on the situation in the construction industry and how it has managed to successfully assert itself on the market for over 30 years.
Spillenburg Mill
The NEW ISLAND project It was the Prussian King Frederick II, also known as “Old Fritz”, who promoted shipping on the Ruhr at the end of the 18th century and had a series of locks built.
The Bow
Freiburg’s best building for the “war for talents”: that is the aim of The Bow.
The ultra-modern office building is currently under construction on the freight depot site in Freiburg im Breisgau.
The client is Projekt IKS 2021 GmbH,….
Planning The Bow
The ClimaLevel Multiboden will play an important role in creating maximum thermal comfort in Freiburg’s flagship project The Bow.
House Roth
Roth solid houseHeating, cooling, ventilation in the house by the lakeEnrico and Denise Gröger always knew that they would build their own home in...
Hygiene
As long as the multi-floor is installed, there will be a discussion about the extent to which this type of air routing is compatible with the hygiene requirements of ventilation systems.
lala
VDI 6022Multi-floor and hygieneAs long as the multi-floor is installed, there will be a discussion about the extent to which this type of air...
Multi-floor and hygiene
As long as the multi-floor is installed, there will be a discussion about the extent to which this type of air routing is compatible with the hygiene requirements of ventilation systems.
Infrared heaters
The simple basis of electro-direct or infra-
red heaters is the heat generated when an electric current flows through the resistance of a heating element. Electricity generates heat…
Modern living in Brühl
In the picturesque town of Brühl in North Rhine-Westphalia, a new residential quarter is being built that will enrich the region’s housing market. With a focus on sustainability and comfort, two construction projects with six apartment buildings each are being realized.
TUP Campus, 2nd construction phase
The software company TUP does not pay lip service to sustainability. It already set standards in 2016 with its new company headquarters in Stutensee. Thanks to an innovative combination of technologies, the certified passive office building…
Interview with Malte Weidemann
The energy concept for the TUP extension was developed by the Weidemann planning office in Bad Sassendorf. Owner Malte Weidemann has been planning heat pumps exclusively for over ten years, most of which are powered by renewable energy.
Reiter Architects
The ClimaLevel Multiboden has not only proven itself in residential and office buildings, but also impresses in museum and church buildings with its outstanding cooling, heating and ventilation properties.
Baltique Travemünde
The old fishing port in Travemünde is currently undergoing a makeover. In addition to a new promenade, the BALTIQUE is a new residential quarter directly on the River Trave. By autumn 2024, around 18,000 square meters….
Planning expertise
In times of massively rising energy prices and stricter legal requirements for existing buildings and their heating systems, it is important to maintain an overview of the possible measures for the energy-efficient refurbishment of existing buildings.
ClimaLevel System mini
The MiniNopp technology from ClimaLevel is suitable for installation ON existing floor constructions in existing buildings. The system can be installed over existing tiles, wooden floors or existing screeds.
ClimaLevel System-IN
If you want to install underfloor heating in your old building, you have various options to choose from. The classic system with heating
screed, which we have been using for a long time in new buildings, is usually not used in old buildings. The lack of installation height…
Climalevel wall heating
If you want to heat the house with low flow temperatures for an efficient heat pump, you need large heating surfaces. If, for whatever reason, the floors are not available as a heating surface…
Infrared heating
Water-based heating systems have determined the planning and design of heating systems for decades. Compared to air heaters, water as a heating medium has the advantage of a considerably higher specific heat capacity.
Underfloor cabling
When planning and operating office buildings, data and energy connections need to be as flexible as possible. For this reason, the laying of power and data cables in the underfloor area has proven its worth.
Hinz and Holthausen
The new company headquarters of the Cologne-based family businesses Helmut Hinz GmbH & Co. and Holthausen GmbH have a number of similarities, but are completely independent – just like the two sanitary and heating specialist companies…
Quartier Hohenlind
Many people in the growing metropolis of Cologne are looking for suitable living space. Demand has outstripped supply for years. Densification is difficult, open spaces for new buildings are rare. This makes it all the more necessary…